- Healthy Living
- This year, I am training in taekwondo to meet DPA requirements (150 mins/week of moderate to vigorous physical activity).
- Next year, I will train in taekwondo to meet DPA requirements.
- Other than physical activity, I will also need a concrete plan for health eatingĀ and stress managementĀ in order to lead a healthy life after graduation.
- Course Credits
- I need _80_ credits to graduate. A typical course is worth _4_
- _48__ of them must be from required courses.
- _28__ of them must be from electives.
- I need _80_ credits to graduate. A typical course is worth _4_
- _16__ of them must be from Grade 12 courses.
- At the end of this year, I will have _80__
- Community Connections
- I need _30__ hours of work/volunteer experience. To show I completed this, I must show proof in the form of pay stub or reference letter.
- I can start accumulating these hours in Grade 10.
- My plan to earn work/volunteer hours is through volunteering at the PoCo Rec Center or help train kids at my local taekwondo.
- I will also need to complete a reflection that includes how I benefited from the experience. It will be _200_ typed words minimum.
- Career and Life
- In addition to updating my resume, I will also create Career, Life and Financial Plan to show that I have a plan in place after graduation.
- When I graduate, my current plan is to go to university and study computer engineering.
- Interview
- To prepare for the interview, I can look at the questions ahead of time. They are found on the grad transitions website.
- My interview will be with a Riverside staff member
- The 3 people at Riverside who are here to help with this process are:
- Mr. Thomson
- Ms. Luddu
- Ms. David
In Grade 12, I will find all the necessary documents AND submit them at the Grad Transitions website.
I will complete Grad Transitions 12 whenever I have English 12. If I have it in 1st semester, I must complete everything except the interview before sale of Winter Ball tickets. In 2nd semester, everything except the interview must be completed before end of April.