Collaboration Fluency

Our Contract was that we would not break anything, accident or on purpose, that had to do with our project.

The schedule was to get the materials needed, then assemble the house and the wires

The house, if you look at my electric house post, did okay in the execution

The planning was not as good as it could have been and we could have planned a lot better for the project

 

Leave a Reply

Skip to toolbar